Visualizzazione post con etichetta Norway. Mostra tutti i post
Visualizzazione post con etichetta Norway. Mostra tutti i post

9/25/2010

UNCOVERING BARENTS SEA. (Scoperchiando il Mare di Barents)

Talking to journalists this week, Minister Trutnev called the Russian-Norwegian delimitation of the Barents Sea as “a truly historical event for the development of Russian geology”. –We get the chance to study, and then hopefully exploit, resources estimated to tens of billions tons of oil equivalents, RIA Novosti reports.

He also stressed that Russia is obliged to develop trans-border resources jointly with Norway, Oilru.com reports.

Read also: Norway and Russia sign maritime delimitation agreement

As previously reported, Trutnev last week confirmed that Statoil will be given exclusive rights as Norwegian partner in all the transborder projects. Other foreign companies will have to negotiate with the parts to get stakes, he underlined.

The deal signed last week in Murmansk could thus give Russia a new oil and gas province, Trutnev says. He believes that prospects are big both on the Russian and Norwegian side of the border.

-There are up to ten structures which we believe can be adhered to the category of “huge” and “unique”, the Russian minister said, RIA Novosti reports. He stressed that exploration in the area can start only after the ratification of the deal by the two countries’ legislative assemblies and that it subsequently will take “at least 5-7 years” to study the structures and a minimum of 12-15 years before production can start.

Trutnev doubts that the shelf will become the new hydrocarbon resource base for Russia by year 2020, an objective proclaimed by federal authorities. -This is a "very complicated and unrealistic task", he says, RBC.ru reports.

As previously reported, Trutnev was part of the Russian delegation attending the signing ceremony on the delimitation of the Barents Sea and the Arctic Ocean. After the ceremony, Trutnev said that the Barents Sea could hide as much as “25 percent of hydrocarbon resources on Planet Earth”.
(BarentsObserver)

3/10/2010

WELCOME TO SHTOKMAN. (Benvenuti a Shtokman)


Background information


The Shtokman gas and condensate field - one of the biggest offshore fields of its kind - was discovered in 1988. The field is located in the central part of the Russian sector of the Barents Sea shelf, about 600 km northeast of the city of Murmansk at sea depths varying from 320 to 340 m.

The field’s C1+C2 reserves account for 3.8 tcm of gas and circa 37 mln t of gas condensate.

The Sevmorneftegaz - a 100 percent Gazprom subsidiary - holds the license to the project. The operator company is the Shtokman Development Company, a Swiss-registered joint venture of Gazprom (51%), Total (25%) and StatoilHydro (24%).

The Shtokman gas will be shipped partly by pipeline, partly as LNG.

According to plans, the field is to be in production from year 2013.

The village of Teriberka located northeast of Murmansk City has been chosen as the main hub for Shtokman operations.
(Barents Observer)


Shtokman postponed 3 years

The Shtokman Development AG's board of directors today decided to postpone the development of the huge field in the Barents Sea with three years.

A press release from the company confirms that a final investment decision in the project's pipeline part will be taken in March 2011, while the decision on the LNG part will be taken before the end of 2011, newspaper Vedomosti reports.

About 50 percent of the 3,8 trillion cubic meter of Shtokman gas is planned developed as LNG, the remaining shipped through pipelines. The Shtokman field, located offshore about 600 km north of Murmansk, has long been a top priority project of Gazprom. It is to be developed by the Shtokman Development AG, a company controled by Gazprom (51%) in partnership with Total (25%) and Statoil (24%).

Both the Shtokman Development AG and Gazprom has long stressed that the project will be in operation from year 2013 (the pipeline part) and 2014 (the LNG part).

As BarentsObserver has reported, several experts have recently claimed that the huge Arctic project will face serious delays, and that it might even never be developed. Among them is Oddgeir Danielsen from the Norwegian Barents Secretariat. Now, the project will not be in production before 2016, at earliest.
(Barents Observer)


Disputed waters on the agenda

Just few weeks before Russian President Dmitry Medvedev arrives in Oslo for a state visit, both Norwegian Prime Minister Jens Stoltenberg and Russia’s Vladimir Putin highlight the positive dynamics in talks over the disputed waters in the Barents Sea.

In their meeting in Helsinki yesterday, Stoltenberg and Putin confirmed the “good and productive atmosphere” in the talks over the delimitation of the Barents Sea. Both men agreed that a deal would significantly facilitate new joint projects in the two countries’ High North.

-I believe that if we manage to solve this issue, new fields of opportunities for extended economic cooperation will open, among them in the energy sector, Stoltenberg said in a press conference following the meeting, the Russian Government press service informs.

The meeting, which was held during the Baltic Sea Action Summit, lasted for about 45 minutes, and both the Shtokman field and the disputed zone were on the agenda. Both issues are highly inter-related. The huge Shtokman field is located not far from the disputed 155,000 square km zone, and is by the Norwegian side seen as a strategically key project.

In addition, the zone is believed to hide significant hydrocarbon resources. A deal on the zone delimitation and subsequent oil and gas developments in the area would have major possible impact on the Shtokman field development.

In a time with uncertainties in the world gas market, the opening of the disputed waters for oil and gas activities, would make the development of the Shtokman field more attractive. The Shtokman developers Gazprom, Total and Statoil would then not only be able to use field infrastructure in additional projects, but also have a significant chance to succeed in bids for other fields in the area.

Talking to newspaper Aftenposten after the meeting in Helsinki, Prime Minister Stoltenberg underlined that hydrocarbon developments in the Disputed Zone are impossible as long as there is no delimitation deal. He also highlighted that the oil and gas resources in the zone are located far closer to land than the Shtokman field and that they would therefore also be far easier to develop.

Talks between Norway and Russian on the delimitation of the 155,000 square kilometer zone in the Barents Sea have been going on for almost 40 years. While Norway wants to divide the zone based on a middle line principle, Russia insists that a sector line principle is applie
(Barents Observer)


Gazprom discussed Shtokman timeline

The development of the first development phase of the Shtokman project was on the agenda when Gazprom Deputy Aleksandr Ananenkov today met with owner representatives of the Shtokman Development AG.

The meeting, which took place in the Moscow headquarters of Gazprom, discussed preparations for the development of the project, and especially issues related to time schedules in the project’s first development phase, a press release from the company reads.

The company in early February announced that the project launch will be postponed from 2014 to 2016 and that a final investment decision will be made only in 2011, and not in 2010 as earlier planned.

However, as reported by BarentsObserver this week, representatives of project partner Total maintain that the project is on schedule after all. That was also stated earlier by Gazprom Deputy Aleksandr Medvedev
(Barents Observer)